Michael Jeans

Shakespeare Street surface failure ctd.

Posted in Leamington NZ by Michael Jeans on 9 December 2009

Melted tar Shakespeare Street NZ

Melted tar Shakespeare Street NZ

It’s at its worst between Moore and Arnold right outside Cee Jaes Dairy (which incidentally just happens to have it’s very own Bebo fan page). The tar left exposed by the May 2009 failure of the then recently applied road surface has melted big time (28 – 30C air temp). It is very messy!

Update 1600 10 December 2009: From WDC: ‘our contractor has scheduled remedial work on this site for tomorrow

This may be useful.

Add to: Facebook | Twitter

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

Gravatar
WordPress.com Logo

You are commenting using your WordPress.com account. Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 288 other followers